HOW WE COMPLETE PROJECTS
projects

If you already use a generator system, a sustainable microgrid soluton can complement your current set-up and save you on energy costs or replace it completely leading to total grid independence and massive financial savings over time.

Specifically we provide: Engineering, Procurement & Construction (EPC)

Engineering Phase:

  • Preliminary engineering sufficient to specify and order equipment. Includes, as necessary, soils and drainage analysis for ground-mounted systems.
  • Detail engineering of the entire system including all the disciplines - civil, mechanical, architectural, electrical and controls
  • Integration engineering of the electrical interconnection with the customer. 

Procurement:

  • Specify and purchase all major equipment (modules, racks, inverters, switchgear, control systems, etc.)
  • Purchase all construction materials such as wiring, conduit, fasteners, concrete, etc.
  • Arrange for shipping, receiving, insurance, title transfer, and unloading at the site

Construction:

  • Arrange for (as required) insurance, site security/fencing, temporary utilities, bonding, site safety program, waste/scrap disposal
  • Perform (as required) site clearing, demolition and disposal
  • Perform any civil/architectural work including foundations, underground wiring, roof modifications, etc.
  • Install all equipment o Install all interconnecting wiring, power cable, power terminations
  • Maintain overall construction schedule o Provide regular progress updates to customer
  • Perform pre-commissioning wiring and equipment checks o Test, troubleshoot and commission system Complete any punch list items

DOWNLOAD Our Microgrid Whitepaper And Find Out How You Can Benefit From Sustainable Power

Call 1-855-979-8220 Today To Find Out More About Toromont Cat Microgrid Systems And Start Saving On Energy Costs, Freeing Yourself From Grid Dependence And Getting Power Security


OUR SOLUTIONS

CONTACT INFORMATION

Telephone: 1-855-979-8220

Main Office: 268 Orenda Road
Brampton, Ontario
L6T 1E9

©2024 Toromont Industries. All rights reserved.