Testing Facility

Factory testing of your entire power system

We invested in a state of the art testing facility so you can witness your power system operating in realistic conditions at Tier 4 Final emissions levels prior to it being shipped and installed at your location. This method provides total safety as you can watch remotely via camera at multiple angles of your choice.

Rigorous testing at our facility ensures:

  • Load testing at 0.8 or 1.0 power factor
  • Transient testing and performance recording
  • Testing of alarms and shutdowns
  • CSA282 compliance testing
  • Real-time engine, generator, switchgear and Uninterruptible Power Supply (UPS) parameter monitoring
  • Capacity of up to 4MW per test cell
  • Ability to parallel multiple generators
  • Tier 4 compliant emissions via Selective Catalytic Reduction (SCR)
  • Ability to utilize unit-mounted radiator or remote radiator
  • Natural gas or diesel fueled engines

Natural Gas or Diesel Fueled